Diagnose a sports ground irrigation fault and set a schedule
You are an Irrigation Technician in the Irrigation, Chemicals and Plant team.
What has happened
The council has reported dry patches on oval 2 at Kurrawong Sports Reserve and zone 3 of the pressurised system is reading low pressure. The system has a pump station, disc filters, a controller, solenoid valves and pop-up sprinklers on laterals. Work order WO-26-0416 is open. Spring sport starts in a fortnight and the council's water allocation for the reserve is limited. The supervisor wants a fault diagnosis from the pump through to the sprinklers, a repair or a repair specification, soil moisture readings and a two-week irrigation schedule that keeps the ovals playable within the allocation.
Deliverables
- Troubleshooting log with readings at each point
- Distribution uniformity results
- Repair record or specification
- Two-week irrigation schedule
- Council report
Documents to use
Systems to use
Work Orders
Scheduled maintenance, inspection, construction and conservation jobs for council, landscape and program clients, with crew allocation and completion tracking.
Field Activity Log
The record of every paddock, orchard, nursery and conservation site activity, from sowing and harvest to planting, monitoring and weed control.
WHS Incident and Hazard Register
The register of injuries, near misses, hazards, chemical exposures, machinery and livestock incidents across all sites, with investigation and corrective action tracking.
Units of competency
Current on training.gov.au for the Agriculture, Horticulture and Conservation and Land Management Training Package as at 10 September 2026.
AHCIRG338Troubleshoot irrigation systemsAHCIRG437Schedule irrigationsAHCIRG347Maintain pressurised irrigation systemsAHCIRG339Monitor soils under irrigationAHCIRG337Measure irrigation delivery system performanceQualifications
AHC32424Certificate III in Irrigation TechnologyAHC41124Certificate IV in Irrigation ManagementWhat to look for
Evidence guide
Look for a logical diagnostic sequence from pump to sprinkler with recorded readings, a correctly measured and calculated distribution uniformity, a fault identified with evidence, a repair or specification that addresses the cause, soil moisture readings interpreted correctly and a schedule whose run times reconcile with the water requirement and the allocation.